Spirotech recently designed, built and delivered a 60.000 litre insulated stainless steel energy recovery vessel for a major UK dairy.

The client required that the energy recovery vessel was designed and built to PD5500 to ensure complete operational peace of mind, and that the tank was insulated at Spirotech’s works prior to loading and delivering the unit.

Spirotech-SRD Group complete large energy recovery vessel

Negating risk of damage

In order to do this the team designed the build sequence to take into account the support cradles that would allow the thermal insulation to be added without the risk of damage when it was being loaded and offloaded and lifted into position. This saved the client a considerable amount of money and time.

Designed, built and delivered by Spirotech

The energy recovery vessel was designed and built in our Sawtry works and Spirotech’s installation team then oversaw the loading, delivery and installation on the site. The vessel is in position and ready for Spirotech’s client to integrate into its own system.

Spirotech-SRD Group complete large energy recovery vesselSpirotech’s installation team oversee the loading of the energy recovery vessel

Spirotech-SRD Group complete large energy recovery vesselSpirotech’s installation team commence delivery

Spirotech-SRD Group complete large energy recovery vesselEnergy recovery vessel in position and ready for Spirotech’s client to integrate into its own system

More about energy recovery